CLIENT

Ministry for Resources & Rural Affairs

Request

This project required both an Environmental Impact Assessment as well as an Appropriate Assessment

In order to complete these studies, a number of Environmental Baseline Surveys were carried out in fulfillment of the Terms of Reference compiled by the Environment and Resources Authority (ERA).

Each study had assessed the present state of the site. This in turn led to a comprehensive investigation which was necessary in order to foresee any possible impact that the proposed project will have.

wind farms

Our Input:

AIS Environment compiled an Environmental Impact Statement (EIS) for both Wied Rini and Sikka l-Bajda proposed windfarms. The studies carried out covered:

  • Agriculture
  • Archaeology
  • Avifauna & Bats
  • Geology
  • Human populations
  • Land uses & terrestrial ecology
  • Waste management
  • Noise and a visual assessment

Results

Environmental Impact Assessment

Each Environmental Impact Statement (EIS) delivered mitigation and compensatory measures for each environmental impact.

The mitigation measures included modifications to the wind farm turbine size and layout.

A monitoring programme was also proposed to be implemented during the construction and operational phases of the development.

Appropriate Assessment (AA)

Coordinated Appropriate Assessments for the onshore wind farms of Hal Far and Wied Rini, and the offshore wind farm at Sikka l-Bajda were carried out by AIS Environment.

These assessments included all the relevant ecological receptors in the area and the potential impacts and mitigation measures posed by the development. 

Discover the assessments carried out for the Delimara Power Station